A TCO analysis (total cost of ownership) adds up every cost of a system over its whole life, not just the purchase price, and subtracts what you recover at the end. For HPC and AI infrastructure, the cost that decides the outcome is rarely the server quote. It is power, cooling, networking, staff, freight, duties and the years of use you actually get. This guide shows how to build the analysis, where it goes wrong, and how to compare on-premises, cloud and hybrid on equal terms. We have worked on HPC and AI infrastructure projects since 2011, and the analysis below follows how those projects are scoped: from sourcing through deployment and support.
TL;DR
- TCO is the purchase price plus every other cost over the system's life, less any residual value. A decision made on price alone misses the costs below the waterline.
- For AI clusters, networking, cooling and power infrastructure are often as large as the chips themselves, so rack density and efficiency drive the result.
- Compare on-prem, cloud and hybrid only at equal service levels, over one horizon (three or five years), with every assumption written down.
- Include freight, duties, tariffs and exchange rates for global deployments. They sit in the "external costs" most spreadsheets leave out.
- Report a range and a break-even point, not one falsely precise total.
Table of Contents
- What a TCO analysis actually measures
- Direct and indirect costs for HPC and AI
- How to calculate TCO step by step
- Comparing on-premises, cloud and hybrid
- Location and power: the global deployment factor
- Common mistakes in a TCO analysis
- Where Dormedia fits in the analysis
- Our perspective
- FAQ
- Sources
What a TCO analysis actually measures
The New Zealand government's procurement guide defines TCO as the purchase price plus all other costs incurred over the whole life of an asset, less any income received, such as residual value on disposal. It uses an iceberg image: the price is the visible tip, and the larger mass of installation, operating and maintenance cost sits below the surface.
The guide's worked example is simple. A higher-priced new fridge came to $1,025 over five years, while a cheaper second-hand one came to $1,500 once running costs and resale value were counted. The same logic applies to a GPU cluster, only with seven-figure numbers.
Gartner's definition of IT TCO, as quoted in a 2017 college district IT plan, goes beyond the IT budget. It covers hardware and software acquisition, management and support, communications, end-user expenses and the opportunity cost of downtime and training. For a research group or a product team, downtime of a training cluster is a real cost, even though no invoice shows it.
IBM's overview adds a practical note: there is no one-size-fits-all formula. A rough version adds initial, operating, maintenance and downtime costs and subtracts end-of-life value. You build the model to fit your workload.

Direct and indirect costs for HPC and AI
The New Zealand guide separates direct costs, which attach to a specific good, from indirect ones such as rent, taxes and equipment maintenance. It further splits indirect costs into fixed (insurance, salaries) and variable (electricity, consumables). That structure works well for infrastructure, if you fill it with the right items.
The South African National Treasury's TCO good practice guide (updated February 2024) sorts cost components into three groups. It is a useful template for global projects:
- External costs: purchase price, inbound freight, insurance, packaging, exchange rate effects, duties and taxes.
- Internal costs: installation, operation, training, recovery and disposal.
- Joint costs with the supplier: redesign and development work.
For HPC and AI, we would turn that into a working list:
| Category | Typical items | Often missed |
|---|---|---|
| Acquisition | Servers, accelerators, memory, storage, switches | Spares, extended warranty |
| Landed cost | Freight, insurance, duties, tariffs, currency | Customs delays, tariff changes mid-project |
| Facility | Space, racks, power distribution, cooling | Retrofit of existing rooms |
| Operations | Electricity, maintenance, admin staff, monitoring | Facility overhead on power |
| Software and people | Licenses, security, training, adoption time | Staff time learning a new stack |
| End of life | Decommissioning, resale or disposal | Data sanitization, recycling fees |
An ACM survey of cyberinfrastructure investments lists nearly the same items: acquisition and depreciation, facilities, electricity including facility overhead, networking and data-transfer fees, system administration staff, software, security and monitoring. It also notes that egress fees can be a major factor in cloud or external co-location but not on-premises.
Why density and power often decide the result
A 2025 KAIST study on datacenter TCO for LLM inference finds that networking, cooling and power infrastructure costs are frequently as large as, or larger than, the chips themselves. Racks and cooling equipment cost roughly the same no matter how many processors you run, while electricity scales with processor count. The per-chip infrastructure cost therefore depends on how many servers fit in a rack, which makes chips per rack a major lever.
That is why layout and thermal design belong in the TCO model from day one. Our multi-part guide to rack server configuration for layout, power and cooling walks through those choices, and the piece on measuring and improving data center energy efficiency covers the power side.
A similar point shows up in LLM training cost budgets: the spread between a small experiment and a frontier run is mostly a question of scale, utilization and infrastructure, not sticker price.
How to calculate TCO step by step
There is no single formula, but the process is consistent. Here is the routine we recommend, with the point where each step usually fails.
1. Define the workload and the horizon
Write down what the system must do: training, inference or simulation, the expected utilization, availability target and growth. Then choose one horizon. Lawrence Berkeley National Laboratory's HPC procurement guidance defines HPC TCO as the cost to purchase and operate a system for a specified time, for example five years, for a defined workload. The same document notes that TCO-based procurement has worked well at European centers such as LRZ in Germany and CINES in France.
Where it goes wrong: comparing a three-year cloud term with a five-year hardware life. Pick one horizon and apply it to every option.
2. List every cost, including the landed cost
Use the table above. For hardware bought across borders, price the full landed cost: freight, insurance, duties and tariffs, and the exchange rate on the day you pay. These are the lines most often left out, and tariffs can change during a project. Our work covers global shipping and tax and tariff solutions alongside sourcing, so those lines are priced together with the hardware instead of added late.
3. Amortize capital over useful lives
Microsoft Research's 2026 paper on datacenter lifecycles uses an annualized model in which capital costs are spread over useful lives: facility 15 to 30 years, network 7 to 10 years, IT equipment 3 to 5 years, using straight-line or declining-balance depreciation. Operating costs (energy, maintenance and repair, network) are added, and results are normalized per delivered kW so designs can be compared.
Where it goes wrong: depreciating accelerators over the facility's life. GPUs and servers turn over in years, while the building and power plant last decades. Mixing the two hides a refresh cycle you will have to fund.
4. Model utilization and power
The CYBER-INSIGHT framework from the University of Utah expresses cost per resource as lifetime and efficiency terms plus power used times power cost plus hosting cost, with node count, core count and average utilization as attributes. Whatever model you use, idle hardware is still paid for. A cluster at 40% utilization costs about twice as much per useful hour as one at 80%.
5. Add people and adoption time
System administration staff, security work and the time teams spend learning a new stack are real costs. The ACM survey stresses that analyses must be sophisticated enough to capture the time cost of adopting new technology, not only hardware and power.
6. Subtract end-of-life value, then test the assumptions
Resale or reuse value reduces the total. Then vary the inputs: power price, utilization, hardware price, refresh interval. Report which assumption moves the answer most.
Comparing on-premises, cloud and hybrid
The fairest comparison prices the same service level in every option: the same users, regions, workload volumes, availability targets and security controls. It also shows when each cost lands, because on-premises mixes capital and operating spending while most cloud resources are consumption-based operating spending. KPMG's cloud economics guidance describes a three-step run-rate model: capture needs from existing capacity and expected growth, map them to equivalent cloud offerings and price them, then weigh that against keeping the infrastructure in-house.
For sustained AI workloads, the numbers can be large. A May 2026 study by Olds Research compared a 248-GPU on-premises cluster with three major cloud providers. Assuming about 80% utilization and 24x7 operation, the three-year cost was $26.0M on-premises against $71.5M to $100.1M in the cloud. Over five years the gap widened to $29.2M against $119M to $167M. These are one study's assumptions, so treat them as an illustration of why you should model your own utilization, not as a quote for your project.

Utilization is the swing factor. Steady, high-utilization workloads favor owned infrastructure. Bursty or experimental workloads change the picture, which is why many teams run a hybrid model with a baseline on owned systems and peaks elsewhere. Whichever mix you choose, price the migration, any parallel-run period and the exit costs too.
Location and power: the global deployment factor
Where you deploy changes the total. Researchers studying supercomputing powered by stranded renewable energy found TCO reductions of 21 to 45% in high-power-cost regions by siting compute where power is cheap. That model used specific assumptions from 2016, so use it as a reminder to price electricity by site. For background on how generation capacity and cost vary by region, see this global wind energy outlook.
For a multi-region rollout, add per-site power rates, local import duties, shipping lead times and support coverage. A model built for one site rarely transfers cleanly to another.
Common mistakes in a TCO analysis
- Counting only IT-department costs. Gartner's guidance, summarized in a 2005 paper, warns that limiting the scope to the IT budget is misleading and calls for annualized figures with multiyear investments amortized.
- Treating TCO as a value test. A TCO figure measures expense. An arXiv paper on cyberinfrastructure quality metrics notes it gives no information on the relationship between cost and benefit, so pair it with performance per dollar or throughput per workload.
- Hiding assumptions. The ACM survey recommends stating every assumption used to compare environments so others can rerun the numbers with different inputs.
- One precise total. Show a range and a break-even point instead.
A quick way to use throughput: the KAIST paper compares systems through relative server cost, infrastructure cost and throughput ratios. A ratio below 1.0 means the lower-performance system is the more cost-effective one, and above 1.0 favors the faster system. This keeps a cheaper but slower option from looking better than it is.
Where Dormedia fits in the analysis
A TCO model is only as good as the quotes and lead times behind it. We design, source, deploy and scale HPC and AI infrastructure, and our services cover customized server and component configurations, data center solutions, global shipping, tax and tariff solutions, project management and ongoing support. Our network of vendors and logistics partners is built to deliver optimal pricing and delivery timelines, which feeds directly into the acquisition and landed-cost lines of your model. If you are scoping a project, see how our consulting engagements for HPC are structured, or start from our services overview.

Bringing the analysis to us early means the configuration, power and cooling design, shipping and tariff treatment are modeled together, and the strategic advisory work can test the assumptions before you commit.
Our perspective
Most TCO spreadsheets we see start from a server quote and add a line for power. In HPC and AI, that order is backward. The workload, the rack density and the site decide the total, and the hardware price follows from them.
That is why we treat design, sourcing, shipping, tariffs and support as one project. A configuration that fits more compute per rack, a delivery plan that respects customs and lead times, and a support arrangement that keeps utilization high all change the number at the bottom of the model.
Since 2011 we have worked on complex global deployments, and since 2017 we have focused on HPC and AI. Our view is simple: write the assumptions down, price the landed cost honestly, and let the analysis shape the build.
Dormedia
FAQ
What is a TCO estimate?
It is an estimate of all costs of an asset over its whole life: the purchase price plus installation, operating and maintenance costs, less residual value on disposal. The New Zealand procurement guide uses this definition. It lets you compare options by lifetime cost rather than price.
How do you calculate total cost of ownership?
Add acquisition, operating, maintenance and downtime costs over a fixed period, then subtract end-of-life value. IBM notes there is no universal formula, so adapt the categories to your workload. For infrastructure, a three to five year horizon is common.
Which costs matter most for AI infrastructure?
Power, cooling, networking and facility costs are frequently as large as the chips, according to the KAIST study. Rack density, utilization and electricity price are therefore the first inputs to test. Freight, duties and tariffs matter for cross-border purchases.
Does TCO tell me whether a system is worth buying?
Not alone. It measures expense, not benefit, so pair it with throughput or performance per workload. Together they show which option delivers the most useful compute for the money.
Sources
- Total Cost of Ownership: an introduction to whole-of-life costing (New Zealand Government)
- Information Technology Plan: Total Cost of Ownership (Chabot-Las Positas CCD, 2017)
- What Is Total Cost of Ownership? (IBM)
- Total Cost of Ownership Analysis good practice guide (South African National Treasury)
- An Inquiry into Datacenter TCO for LLM Inference with FP8 (arXiv)
- Assessment of financial returns on investments in cyberinfrastructure facilities (ACM)
- Energy Efficiency Considerations for HPC Procurement (Lawrence Berkeley National Laboratory)
- Rearchitecting the Datacenter Lifecycle for AI (Microsoft Research)
- CYBER-INSIGHT: Evaluating Cyberinfrastructure Total Cost of Ownership
- Cloud Economics: Making the Business Case for Cloud (KPMG)
- The Real Cost of AI Infrastructure, May 2026 (Olds Research)
- Extreme Scaling of Supercomputing with Stranded Power (arXiv)
- Defining Gartner Total Cost of Ownership
- Cyberinfrastructure quality metrics (arXiv:2502.07833)
- LLM Training Costs: 3 Budgets for Engineers
- Global Overview and Future Outlook of Wind Energy